The board of Norther Wind Farm visits the Sif factory where the transition pieces and monopiles are fabricated. Koen Baeten, QA manager Norther: ‘Monopiles of 8 meter diameter, 80 meters long and total weight of 1000 tonnes: that is really impressive’!