Ga naar hoofdinhoud
Location
196 km from the shore of Yorkshire
Wind turbines
GE Haliade-X, 12 MW
Number of turbines
95
Total capacity
1,2 GW
Owner & developer
SSE/Equinor/Eni
Client Sif
SSE/Equinor
Foundation
monopiles
Water depth
18-63 meters
Weight (-t-)
103.087
Diameter
8/8,6 meters
Length
54,9/71 meters
Foundation
transition pieces
Weight transition pieces (-t-)
35.941
Diameter transition pieces
8/8,3 meters
Length transition pieces
27.350 meters
Mennomulder com 15

Dogger Bank B

Dogger Bank Wind Farm is an offshore wind farm being developed in three phases – Dogger Bank A, B and C – located between 130km and 190km from the North East coast of England at their nearest points.

Collectively they will become the world’s largest offshore wind farm.

Each phase will have an installed generation capacity of 1.2GW. Combined, they will have an installed capacity of 3.6GW and will be capable of powering up to 6 million homes.