Status
Installed and commissioned
Location
approx. 12-25 km from the coast of Guérande
Wind turbines
6 MW turbines
Number of turbines
80 Siemens SWT-7.0-154 turbines
Annual production
480 MW / about 630,000 households
Owner & Developer
EMF (EDF 50%)
Sif Client
Eiffage Métal SAS
Foundation
monopiles
Water depth
approx. 12-25 metres
Installed
2022
Resource Downloader aspx 6 ret

St Nazaire

The Saint Nazaire wind farm is an offshore wind project being developed in the Loire-Atlantique region in France. It is owned by Eolien Maritime France (EMF), a joint venture formed in May 2016 between EDF Renewables (50%) and its subsidiary Enbridge (50%).

The Saint Nazaire wind farm will be situated on the bench of Guérande, approximately 12 km from the coastline. The offshore wind farm will be equipped with 80 Siemens SWT-7.0-154 7 MW turbines. The wind turbines will be installed at depths between 12 and 25 metres, on monopile foundations with a mast, approximately 12 to 20 km offshore.

References

Hollandse Kust Noord

2020
More

Dogger Bank Wind Farm is an offshore wind farm being developed in three phases – Dogger Bank A, B and C – located between 130km and 190km from the North East coast of England at their nearest points.

Collectively they will become the world’s largest offshore wind farm.

Each phase will have an installed generation capacity of 1.2GW. Combined, they will have an installed capacity of 3.6GW and will be capable of powering up to 6 million homes.

2021
More

Hollandse Kust Zuid

2020
More

Dogger Bank B

2020
More

Dogger Bank A

2020
More

Borssele 1-2

2020
More

St. Brieuc

2020
More

Johan Sverdrup P2

2020
More

Borssele Beta

2020
More

References

Hollandse Kust Noord

2020
Meer

Dogger Bank Wind Farm is an offshore wind farm being developed in three phases – Dogger Bank A, B and C – located between 130km and 190km from the North East coast of England at their nearest points.

Collectively they will become the world’s largest offshore wind farm.

Each phase will have an installed generation capacity of 1.2GW. Combined, they will have an installed capacity of 3.6GW and will be capable of powering up to 6 million homes.

2021
Meer